Industry

Α.Α. Project name Budget
1 Installation of CHP unit 84 MWe using steam technology, boiler heat & combustion gas in aAluminum production industry 47.800.000 €
2 Construction and operation of two brick production units with annual potential of 350.000 m.t and 150.000 m.t. respectively 45.000.000 €
3 Construction of factory for the production of photovoltaic waffers 29.660.000 €
4 Construction of factory for the production of photovoltaic cells 22.496.382 €
5 Construction of plant for the production of flexible packaging products made of plastic prime materials at Avlida, Evoia 12.200.000 €
6  Upgrade of the production quality of Metal Processing industry 11.413.733 €
7 Process automation and computerization in modernization of the supply chain of a Metal Processing industry 9.766.521 €
8  Upgrade of the production quality of a Metal Processing industry 8.949.000 €
9 Upgrade of the production quality of a Metal Processing industry 6.300.000 €
10 Construction of plant for the production of photovoltaic panels (modules) 6.057.400 €

Pages: 1 2