Α.Α. Project name Budget
1 Elaboration of Environmental Impact Study for the Construction of a Concentrated Solar Power plant for Electrical Power Production of 70 MW in Fournia, Municipality of Sitia, Prefecture of Lassithi, Crete 267.812.000 €
2 Elaboration of Environmental Impact Study for the amendment of the Environmental Permit for the Construction of PV Plant for Electrical Power Production of 1,411 MW in the Messinia Prefecture 2.200.000 €
3 Elaboration of Environmental Impact Study for the amendment of the Environmental Permit for the Construction of a Biomass Plant for Electrical Power Production of 250 kW in the Municipality of Fthiotida (Malessina) 1.300.000 €
4 Preparation of a safety plan according to the Sevezo II requirements for EYDAP  
5 Environmental Study for a Package waste Recycling Plant in Rhodes  
6 Envrironmental Study for the Development photovoltaic waffers production plant in Patra  
7 Envrironmental Study for the Development photovoltaic cells production plant in Patra  
8 Expansion and modernisation of  Production of metal or plastic bands & hoops plant in Oinofita of Viotia  
9 Accident Prevention policy study, Safety report & measures (Seveso) for Production of medical gas plant in Aspropyrgos  
10 Accident Prevention policy study, Safety report & measures (Seveso) for the plant in Thessaloniki  

Pages: 1 2 3